Three days of preparation for a garage slab. Leveling the pad with sand. Laying out 2" of foam. Laying out vapor barier, Setting slab and footer forms, laying out remesh, rebar, and pex tubing.
Footer and half the slab completed. It was much easier this time than when we did the house. We bought the cement and had trucks bring it. The hard part was getting 5 yards of cement within 30 mins and rushing to work it out.
Finished Slab.